In Utah, women are natural and effective leaders. Utah women are creative ...Read More
Robert Bowen: Steering a Course for Continued Success
Spotlight
Katy Welkie: Working with Care
Special Section
Building Utah
Editor's Note
Closing the Achievement Gap
Features
In the Loop
Features
Balancing Act
Industry Outlook
Commercial Real Estate
Special Report
Think Big
Legal Briefs
The America Invents Act
Money Talk
Emerging Market Equities
Economic Insight
A Forgotten Virtue
Lessons Learned
The Soft Sell
TechKnowledge
Launch Pad
EntrepreneurEdge
Build Out
Business Trends
Trading Up
Executive Living
Extreme Utah
Players
Players
Provo - A 58-bedroom assisted living facility located at 484 S. 900 East.
Developer/Contractor: Lon LewisArchitect/Engineer: ALM & Associates
Estimated Completion: Spring 2012.
Estimated Cost: Valued at $2 million
BYU Heritage Housing, Phase II Buildings 5 & 6
Provo - The BYU Heritage Housing Phase II Buildings 5 & 6 project is part of a multi-phase master plan to add new student housing to the BYU campus. Buildings 5 & 6 consist of structural steel masonry and innovative energy practices such as closed cell sprayed insulation.
Developer: Brigham Young University
Architect: Architectural Nexus
General Contractor: Jacobsen Construction Company, Inc.
Engineers: Meridian Engineering; Reaveley & Associates; Heath Engineering; ECE Engineering; BLU Line Design
Estimated Completion: May 2013
Outlets at Traverse Mountain
Lehi - Phase One of this 50-acre shopping center consists of 225,000 square feet of shopping center space. The center will ultimately contain 400,000 square feet and 130-140 stores. Amenities will include solar screen canopies, heated walkways and a customer service lobby with a large fireplace.
Developer: Craig Realty Group
Architect: Awbrey Cook McGill Architects
General Contractor: Layton Construction Co., Inc.
Engineers: MW Brown; C&G Engineering; T-Squared; Burkett and Wong
Estimated Completion Date: October 2012
Harmon House Apartments
Provo - Located at 145 E. Center St, Harmon House Apartments is an adaptive reuse of an old bank building to a 24-unit apartment with attached commercial.
Developer: Gardner & Associates
Architect: WPA Architecture
Contractor: Jon Davis Construction
Estimated Completion: Fall 2012
Estimated Cost: Valued at $1 million
Utah Data Center
Lehi - This $1.2 billion project includes 100,000 square feet of a Tier III data center and 900,000 square feet of technical support and administrative space. The facility will showcase numerous innovative technology and energy efficiency features and will be designed and constructed to achieve LEED Silver certification.
Architects: KlingStubbins, Architectural Nexus
General Contractors: Balfour Beatty, DPR, Big-D
Engineers: AGEC; Redcon; CMT Laboratories; Parsons Brinkerhoff; RK Mechanical; J&S Mechanical; ACCO; Ludvik Electric; Truland Electric; Fire Engineering; Aero Fire Protection; Quality Fire Protection; Rapid Fire Protection; Automated Logic Chicago; Psomas
Estimated Completion Date: October 2013
Estimated Cost: $1.2 billion
UDOT I-15 CORE
Lehi - The Utah County I-15 Corridor Expansion (I-15 CORE) is UDOT’s largest road project in state history. It includes reconstructing 24 miles of I-15 from Lehi to Spanish Fork with new concrete pavement, adding two new lanes in both directions, and rebuilding or modifying 63 bridges and 10 interchanges.
Developer: Utah Department of Transportation
General Contractors: Provo River Constructors; Fluor Ames Construction; Ralph L. Wadsworth Construction; Wadsworth Brothers Construction
Engineers: HDR; Baker; Jacobs; HNTB; Horrocks
Estimated Completion: December 2012
Estimated Cost: $1.725 billion
Summit/Wasatch
I-80 Wanship to Coalville
Summit County - This project consists of replacing two bridges using ABC methods on I-80, providing more vertical clearance and widening SR-32 to 4 lanes. The project also involves relocating and replacing all utilities, widening I-80, filling eight miles on I-80 in both directions, and rehabilitating four structures on I-80.
Developer: Utah Department of Transportation
General Contractor: Ralph L. Wadsworth Construction Company
Engineer: Utah Department of Transportation
Estimated Completion Date: October 2012
Estimated Cost: $13 million
Red Ledges Fitness Center and Pool
Heber - The Fitness Center and Pool will offer high-end amenities to the residents of Red Ledges. The full-service fitness center will offer state-of-the-art services including strength conditioning and cardio equipment, yoga and fitness studios.
Developer: Red Ledges LLC
Architect: Z Design
General Contractor: Wadman Corporation
Engineers: ARW; Wilding Engineering
Estimated Completion: July 2012
Estimated Cost: $950,000
Central/Southern
Eastgate Apartments
info@utahbusiness.com | 90 South 400 West, Ste 650 Salt Lake City, Utah 84101 | (801) 568-0114
Advertise with Utah Business